Address
Nanlang Industrial Zone, Xingtan Town, Shunde District, Foshan, Guangdong, China
Work Hours
Mon–Fri, 9:00 AM – 6:00 PM (CST/UTC+8). We aim to respond to all inquiries within 48 hours.
Every tool on XO Fabric, arranged in the order you actually use them. Nothing here needs a login, and nothing asks for personal details. Work out a number, then close the tab.
These 17 calculators are free to use. If a number you get out of one looks wrong, the page under it explains the method and the standard it follows, so you can check the working against something your mill or your QC team would recognise.
Decide what the fabric actually is before anyone quotes a price. Weight, width and yarn count are the three numbers everything else is built on.
Turn width, weight and composition into GSM, and read the result back as a hand feel and an opacity.
Open the toolEstimate GSM from yarn count, loop length and wale/course density, before the fabric is knitted.
Open the toolThe reference table: what weight each construction and end use actually runs at.
Open the toolStart from the garment, get a target weight with a written tolerance for fleece and flocked goods.
Open the toolConvert between metric count, English cotton count, denier and tex without mixing up the direction.
Open the toolMill widths in centimetres against US inches, and the usable width once selvedge is taken off.
Open the toolConsumption, shrinkage and roll limits. These are the numbers that decide whether a bulk order is cut correctly.
Marker consumption with wastage, the way it is actually measured on a cutting floor.
Open the toolTurn a shrinkage rate into the cut size you must actually mark, with the allowance included.
Open the toolMetres per roll from GSM, width and core size, against what a roll core and a person can handle.
Open the toolFrom a quoted metre price to the number that lands in your costing sheet. This is where most importers get surprised.
Consumption, GSM and price per metre into the fabric share of one garment.
Open the toolWhat a mill MOQ means in metres, colours and total order value, and what pushes it up.
Open the toolMill gate to cutting table: freight, insurance, duty, tax, brokerage and inland delivery.
Open the toolBooking, freight and the inspection that decides whether a roll passes or is claimed. The last two steps of an order, and the ones where a paper mistake is hardest to recover from.
Quantity, width and roll diameter into 20GP, 40GP, 40HC and 45HC capacity, with space left over.
Open the toolISO 2859-1 code letter, sample size, acceptance number and the 4-point roll table in one place.
Open the toolShorter calculations for people making something at home rather than running a production line.
Top, backing, border and binding yardage from the finished quilt size.
Open the toolPanel width and yardage worked out from fullness and heading style.
Open the toolCover yardage including welt piping, box pleats and zipper allowance.
Open the toolAre these tools free?
Yes, and they stay free. There is no account, no email capture and no paywall. XO Fabric sells fabric, and the calculators are there to make specifying it easier.
Do the results include my order?
No. Each calculator works from the numbers you type in: your width, weight, consumption, price or metres. Nothing is stored and no figure is looked up from a database, so you can use them for a supplier quote you have not placed yet.
Which tool should I start with?
If you have not fixed the fabric, start at step 1 with the GSM calculator or the width reference. Everything downstream depends on those two numbers being right. If you already know the fabric and are stuck on cost, go to step 3.
I found a number here that disagrees with my mill.
Say so, and check the method rather than the answer first. Most disagreements come from a different test condition: fabric weight measured before or after conditioning, width taken across a different number of picks, or shrinkage tested on a different cycle. The page for each tool lists its assumptions.
Can I use these for a purchase order?
Use them to get your own numbers straight first, then write the method into the order. A calculator result is a starting figure; an order is binding. Where a result affects acceptance, put the standard and the test method in writing.